New Photos of RS' Bear Creek Wetland Mitigation Bank — Year 8 Since Restoration

Written by: Swamp Merchant

I enjoyed great weather today for a flight to take some pics of RS’ Bear Creek Wetland Mitigation Bank straddling US 70 between Goldsboro and Kinston, NC. My family and I are staying with friends further east in Morehead City, and the nearby Beaufort, NC, airport is a convenient place to get up for some photos. Unfortunately, we had less than two hours for the flight and I was unable to photograph any other RS sites in the region.

But Bear Creek is special and can justify its own trip. It is the first project Restoration Systems put in the ground, in 2001. The wet and sloppy areas you see in these photos were bone-dry cornfields before we purchased, restored and protected the wetlands eight years ago. We planted twenty native species and 200,000 trees, as well as removed agricultural levees and backfilled major canals and drainage ditches. The Bear Creek bank and its associated site, Sleepy Creek, required the assemblage of over 1000 acres of property from more than twenty land owners at three locations in Lenoir and Craven Counties.

I look forward to putting up some “before and after” photos of Bear Creek. We have been taking photos of the mitigation bank since 1998 and can show in vivid detail the miracle of environmental restoration.

Feel free to click on a pic to be taken to Google Albums. From there you can play them full screen or download them!

Update: I put some photos of a ground reconnaissance hike we took at Bear Creek a little over a year ago:


View Larger Map

Tags: , , , , , , ,

This entry was posted on Saturday, November 7th, 2009 at 7:42 PM and is filed under air photos, Army Corps of Engineers, wetland mitigation, wetland restoration.

You can follow any responses to this entry through the RSS 2.0 feed.

Both comments and pings are currently closed.

  • http://www.restorationsystems.com/wpblog/index.php/2009/11/video-bear-creek-mitigation-bank-under-construction-in-october-2001/ Video: Bear Creek Mitigation Bank under construction in October, 2001. | Stories from the Field

    [...] New Photos of our Bear Creek Wetland Mitigation Bank — Year 8 Since Restoration [...]

  • http://swampschool.org/new-photos-of-our-bear-creek-wetland-mitigation-bank-%e2%80%94-year-8/ New Photos of our Bear Creek Wetland Mitigation Bank — Year 8 … | The Swamp School

    [...] from: New Photos of our Bear Creek Wetland Mitigation Bank — Year 8 … Retweet this post Posted in blog post | Tags: creek, east, enjoyed-great, further-east, [...]

  • http://www.restorationsystems.com/wpblog/index.php/2009/11/real-world-restoration-and-the-wetland-policy-industry/ Real World Restoration and the Wetland Policy Industry | Stories from the Field

    [...] New Photos of RS’ Bear Creek Wetland Mitigation Bank — Year 8 Since Restoration [...]