2.9 Wetland and Buffer Mitigation. Wetland mitigation may not overlap with riparian buffer mitigation. When wetland mitigation is implemented in a riparian zone using buffer restoration techniques that could also generate riparian buffer mitigation, a decision must be made as to which type of credit will be claimed from the project. A specific area on a project can generate either wetland mitigation credits or riparian buffer mitigation credits. Portions of a project can be designated as generating riparian buffer mitigation credits and portions generating wetland credit, but these areas cannot overlap.
2.10 Nutrient Offset and Buffer Mitigation. Nutrient offset mitigation is required to be stand alone mitigation in order to generate nutrient offset mitigation. Any area being used for nutrient offset mitigation cannot be used to generate stream, wetland, or buffer mitigation credits. Similarly any area being used to generate riparian buffer mitigation credits cannot be used to generate nutrient offset mitigation.
Tags: double dipping, mitigation, mitigation banking, NCDOT, NCEEP, Neuse River basin, north carolina, water quality
This entry was posted on Tuesday, December 8th, 2009 at 6:08 PM and is filed under 401 Water Quality Certification, double dipping, In-Lieu-Fee Mitigation, interesting articles, NCDWQ, NCEEP, north carolina, stream restoration, Swampgate, Uncategorized, wetland mitigation bank.
You can follow any responses to this entry through the RSS 2.0 feed.
Both comments and pings are currently closed.
-
http://swampschool.org/swampgate-purchasing-nutrients-from-a-wetland-bank-prohibited-by-eep/ SwampGate: Purchasing nutrients from a wetland bank prohibited by EEP | The Swamp School